Sign In
Published: 6/21/2017. Updated:

PUBLIC CONSULTATION ON THE REQUIREMENTS FOR THE TRANSMISSION AND DISTRIBUTION SYSTEM OPERATOR‘S ACCESS RULES


NCC, in order to harmonise national and EU legislation in the natural gas sector, publishes a public consultation on the new version of Requirements for the transmission and distribution system operator's access rules (hereinafter – Project).

Substantial modification: it is proposed to harmonise the definitions and provisions of the Project with European Commission regulation (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation (EU) No 984/2013 and other legislation.

Please find attached the project and provide your comments no later till 26th of June, 2017 to the relevant NRA and a copy to rastine@regula.lt.